Day 6:
There are not so many build with regards to the percentage of completeness coz the time was spend mainly on putty, filling and sanding...There are 3 noticeable gaps between the fuselage half and the MG access panel gaps...and the tail section is not level... have to Mr Surfacered it and sand
anyway, here's some of the photos that i can shoot...
The gap between MG access panel

Fill and sand - will prime it tonight to see if this is OK!

The join between the fuselage :


Fill and sand it a few times...still not sure it's ok... tonight will prime it
The tail join.... .. the panel lines must be restored tonight..

Favourite ordnance config...
What's not in the photo are 2 drop tank which suffered bad fitting...it's in the putty shop...


The overall view with the missile launcher ..

Wings?? I plan to do a full sweep and flap and slat down..
The slat leading edge were painted Silver and Red on the inside..
The flap were painted red also on the join.. cant be seen here due to the masking tape.
All leading edge surface on the wings were painted red also..


The ejection seat is at it's 80%.

Finally, the canopy and windscreen after sanded, polished and FUTURE-d. The blue tint was painted on the inside of the windscreen with parafilm as the masking media..

Comments are welcome..
Cheers,
Zaidi
as usual, comments please.....